Centrica Business Solutions has announced plans to convert a decommissioned Lincolnshire gas-fired power station into a battery storage facility capable of supplying the equivalent of a full day’s energy consumption for 11,000 households.
Working in partnership with GE, the company has started construction on a 50MW /100MWh battery storage project at Brigg, which will provide energy storage for the 43 onshore wind farms across Lincolnshire, maximising the potential of every megawatt of green electricity and providing vital resilience for the grid.
Storing renewable energy in this way makes it possible to better control the peaks and troughs associated with renewable energy generation – charging the batteries when electricity demand is low and discharging when demand peaks.
"As the UK’s power generation capacity becomes more distributed and the share of renewables increases, generation flexibility becomes critical to keep the lights on securely, sustainably, and affordably"
Greg McKenna, managing director of Centrica Business Solutions
The battery installed at Brigg represents the largest investment in storage capacity Centrica has made to date. It will have the capacity to store 100MWh of electric energy, equivalent to a full day’s energy consumption for around 15 per cent of the homes in North Lincolnshire.
The battery storage system, supplied by GE, will provide grid support and energy services that will not only provide stability to the grid when there are power disruptions but also ensure renewable energy is utilised optimally, which should free capacity to allow more new renewable generation on the network.
Greg McKenna, managing director of Centrica Business Solutions, said: “Investing in low-carbon energy assets that boost the UK’s ability to store more renewable energy is key to getting to Net Zero. Lincolnshire has 242MW of onshore wind power capacity, but when supply outstrips demand some of those green electrons will go to waste if not stored. Working with GE we’ll store green energy produced locally and use it as efficiently as possible.
"The UK has been one of the earliest and largest players in the battery energy storage space and the installed capacity keeps growing"
Prakash Chandra, renewable hybrids chief executive officer at GE
“As the UK’s power generation capacity becomes more distributed and the share of renewables increases, generation flexibility becomes critical to keep the lights on securely, sustainably, and affordably. Brigg battery storage investment will ensure we can maximise the use of the green energy generated by nearby wind farms – storing when the wind blows and discharging when it doesn’t.”
Prakash Chandra, renewable hybrids chief executive officer at GE, said: “The UK has been one of the earliest and largest players in the battery energy storage space and the installed capacity keeps growing. However, there is a need for more if the country wants to achieve its Net Zero emission target for the power sector by 2035. We are glad to bring another project to life together with Centrica.”
Brigg battery storage is set to be fully operational in late 2023 with plans to run the site for 25 years. The solution implemented will be a 2-hour duration system with GE’s flexible duration architecture that will allow Centrica to modify the duration of the system in response to future grid needs and market opportunities.
NOTES
Technology Stack
The FLEXRESERVOIR battery energy storage solution is a system-integrated battery energy storage and power electronics solution designed for multiple configurations and market applications. It will be integrated together with GE’s FLEXINVERTER, a containerized solution that is designed to deliver a reliable, cost-effective, plug & play, factory integrated power conversion platform for utility scale solar and storage applications.
GE will also provide its Renewable Hybrids Plant Control system to optimize and dispatch the energy stored. The Plant Control solution is part of GE’s FLEXIQ solution, a digital platform that provides design, operation, and fleet management solutions to enable grid compliance and maximize lifetime customer value.
The FLEXRESERVOIR, FLEXINVERTER and FLEXIQ are the key component of GE’s Renewable Hybrids FLEX portfolio, designed to solve customer needs through multiple applications to enable dispatchable, green MWhs.
News
Large scale hydrogen storage sites could reduce customer energy costs by £1bn per year
Sustainability
News
Centrica, Bosch and Ceres launch whitepaper around the role of hydrogen in decarbonising the UK
Sustainability
News
Enabling sustainable fuels – Centrica and European Energy sign agreement on Måde green hydrogen facility
Sustainability
News
Providing More Public Support Is The Key To Unlocking The Net Zero Home
Sustainability
News
Powering Up - Centrica energises Swedish battery deal
Sustainability
News
Centrica strikes 200MW Lithuanian green power deal
Sustainability